It's been a while since I wrote anything, but that's because there hasn't been much happening. A few things did happen in the last couple of weeks though:
![]() |
The handles arrived and were installed. |
![]() |
The toilet paper holder arrived and was installed. |
We also had to choose a type of threshold for the door since the wood floor from the landing was meeting the tile of the bathroom which is slightly higher. We were able to get a good colour match of the oak floor. Yet another thing that I didn't think of having to choose.
In other news, the plumber finished his work, completing the few punch list items and adjusting the toilet flush and shower mixer temperature, pressure and temperature control turning ability.
Meanwhile, I have been working on the expanded wardrobe in the bedroom. I've laid carpet and installed closet rods and am getting ready to install some trim that I got for free. The whole room is definitely not a top notch installation to begin with, what with visible drywall seams, gaps here and there and so on, so it's a pretty low risk operation for me :)
The whole project was actually supposed to be finished last Friday, were it not for the marble shelf and the fact that the glass shower door installer had received glass of the wrong size from their supplier. So now, they are scheduled to install it next Monday. Hopefully that will indeed be the last day.